| 2821 |
National Test House (NR), Ghaziabad
| ETI/OHE/50(6/97) re-designated to TI/SPC/OHE/CAT(Cu-Cd)/0971 (2021) - Technical Specification for Cadmium Copper Conductors for Over Head Railway Traction. |
Technical Specification for Cadmium Copper Conductors for Over Head Railway Traction. |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 8.3.6 (Tensile Strength) |
19000.0 |
|
| 8.3.7 (Wrapping Test on Wire) |
1000.0 |
|
| 8.3.8, 4.1.1 Table-2 (Chemical Composition as per clause 8.3.8, 4.1.1 Table-2 of TI/SPC/OHE/CAT(Cu-Cd)/0971 (2021)) |
5000.0 |
|
|
| 2822 |
National Test House (NR), Ghaziabad
| ASTM D3723 - Standard Test Method for Pigment Content of Water-Emulsion Paints by Low- Temperature Ashing |
Standard Test Method for Pigment Content of Water-Emulsion Paints by Low- Temperature Ashing |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| ASTM D 3723 - 05 (Pigment content) |
1.0 |
|
|
| 2823 |
National Test House (ER), Kolkata
| ISO 10675-1 (2016) - Non-destructive Testing of Welds-Acceptance levels for radiographic testing- Part 1: Steel, nickel, titanium and their alloys |
Non-destructive Testing of Welds-Acceptance levels for radiographic testing- Part 1: Steel, nickel, titanium and their alloys |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 5 (Radiographic Testing of Butt Welds) |
3000.0 |
|
|
| 2824 |
National Test House (NR), Ghaziabad
| IRS : S 63/ 2014 - PVC INSULATED UNDERGROUND, UNSCREENED CABLE FOR RAILWAY SIGNALLING |
PVC INSULATED UNDERGROUND, UNSCREENED CABLE FOR RAILWAY SIGNALLING |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 5.2 (Type Tests (Power Cable)) |
22000.0 |
|
| 5.15 (Visual inspection) |
250.0 |
|
| 5.6 (Dimensions) |
100.0 |
|
| 5.6.2 (Annealing Test) |
1000.0 |
|
| 5.6.3 (Test for Correspondence of Cores) |
100.0 |
|
| 5.7 (Conductor Resistance Test) |
1500.0 |
|
| 5.8.1 (Dimensions:Test for Armour Wires/Strips/Tapes) |
200.0 |
|
| 5.8.2 (Tensile Strength :Test for Armour Wires/Strips/Tapes) |
750.0 |
|
| 5.8.2 (Percentage Elongation:Test for Armour Wires/Strips/Tapes) |
750.0 |
|
| 5.8.5(ii)(a) (Mass of Zinc Coating:Test for Armour Wires/Strips/Tapes) |
1500.0 |
|
| 5.8.5(ii)(b) (Uniformity of Zinc Coating:Test for Armour Wires/Strips/Tapes) |
1500.0 |
|
| 5.8.6 (Resistivity Test:Test for Armour Wires/Strips/Tapes) |
1500.0 |
|
| 5.8.8 (Closeness of Armour Wires / Strips:Test for Armour Wires/Strips/Tapes) |
200.0 |
|
| 5.9 (Test for Thickness of Insulation and Sheath) |
1000.0 |
|
| 5.10.1(ii) (Tensile strength-Before Ageing:Physical tests for insulation, inner & outer sheaths) |
750.0 |
|
| 5.10.1(ii) (Elongation percentage-Before Ageing:Physical tests for insulation, inner & outer sheaths) |
750.0 |
|
| 5.10.1(ii) (Tensile strength-After Ageing:Physical tests for insulation, inner & outer sheaths) |
1000.0 |
|
| 5.10.1(ii) (Elongation percentage-After Ageing:Physical tests for insulation, inner & outer sheaths) |
1000.0 |
|
| 5.10.12 (Shrinkage test:Physical tests for insulation, inner & outer sheaths) |
500.0 |
|
| 5.11 (The period of burning after removal of flame: Flammability test) |
250.0 |
|
| 5.11 (Decomposed length of sample: Flammability test) |
250.0 |
|
| 5.12.1.1 (High voltage test :Signalling Cable) |
3000.0 |
|
| 5.14.1 (AC test:Water Immersion) |
3000.0 |
|
| 5.13.3 (Insulation Resistance test: Signalling Cable) |
2000.0 |
|
|
| 2825 |
National Test House (NR), Ghaziabad
| IS 14268 (2022) - Uncoated stress relieved low relaxation seven - Wire (Ply) strand for prestressed concrete - Specification (First Revision) |
Uncoated stress relieved low relaxation seven - Wire (Ply) strand for prestressed concrete - Specification (First Revision) |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 6.1 (Nominal Mass) |
1500.0 |
|
| 6.1 (Nominal Diameter ) |
1000.0 |
|
| 6.2.3 (Elongation) |
1000.0 |
|
| 6.2.2 (0.2% Proof Load) |
1000.0 |
|
| 6.2.2 (Breaking Strength) |
3000.0 |
|
| 4.2 (Length of lay) |
1000.0 |
|
| 4.2 (Centre wire shall have 1.5% greater in diameter than the surrounding wires - IS 14268: 2022.) |
1000.0 |
|
| 4.1 (Phosphorus, % by mass) |
600.0 |
|
| 4.1 (Sulphur, % by mass) |
600.0 |
|
| 4.5 (Workmanship and Finish) |
1000.0 |
|
| 6.1 (Nominal Area ) |
1000.0 |
|
| 4.1.2 (Chemical composition (Annexure for NABL parameters)) |
3500.0 |
|
| 4 (Chemical composition (Annexure for non-NABL parameters)) |
3000.0 |
|
| Table 2 (Cl 6.2.1, Cl 6.2.2, Cl 6.3) (0.2% Proof Load, Breaking Strength of Strand, Total Elongation.) |
3000.0 |
|
| Note 1 (Modulus of Elasticity, N/mm2) |
1000.0 |
|
|
| 2826 |
National Test House (SR), Chennai
| IS 2365 (2018) - Steel Wire Suspension Ropes for Lifts, Elevators and Hoists |
Steel Wire Suspension Ropes for Lifts, Elevators and Hoists |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 5.0 (Breaking load) |
10000.0 |
|
|
| 2827 |
National Test House (SR), Chennai
| CUS/SR/MECH-8 - Composite Sandwich Shutter |
Composite Sandwich Shutter |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
No Record Found
|
|
| 2828 |
National Test House (SR), Chennai
| CUS/SR/MECH-7 - Composite Plug |
Composite Plug |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 1.0 (Minimum tensile load) |
4000.0 |
|
| 2.0 (Minimum compression load) |
4000.0 |
|
|
| 2829 |
National Test House (SR), Chennai
| CUS/SR/MECH-6 - Composite Chequered Plate |
Composite Chequered Plate |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 1.0 (Deflection) |
3000.0 |
|
| 2.0 (Breaking load) |
3000.0 |
|
|
| 2830 |
National Test House (SR), Chennai
| CUS/SR/MECH-5 - Composite Groove Channel |
Composite Groove Channel |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 1.0 (Deflection) |
3000.0 |
|
| 2.0 (Breaking load) |
3000.0 |
|
|
| 2831 |
National Test House (SR), Chennai
| CUS/SR/MECH-4 - Composite Top Beam |
Composite Top Beam |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 1.0 (Deflection) |
4000.0 |
|
| 2.0 (Breaking load) |
3000.0 |
|
|
| 2832 |
National Test House (SR), Chennai
| CUS/SR/MECH-3 - Composite Top Channel |
Composite Top Channel |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 1.0 (Deflection) |
4000.0 |
|
| 2.0 (Breaking load) |
3000.0 |
|
|
| 2833 |
National Test House (NR), Ghaziabad
| RDSO IRS S 63/2014 : Part 0 : Sec Revision 4 (2014) - PVC Insulated,underground, unscreened cable for Railway Signalling |
PVC Insulated,underground, unscreened cable for Railway Signalling |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
No Record Found
|
|
| 2834 |
National Test House (NR), Ghaziabad
| IS 5410 (2013) - Cement paint - Specification (Second Revision) |
Cement paint - Specification (Second Revision) |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 4.8 ix (Recoating properties) |
1200.0 |
|
| 4.8 viii (Pot life of mixed paint) |
1200.0 |
|
| 4.8 vii (Water repellency) |
1200.0 |
|
| 4.8 vi (Resistance to dry rubbing) |
1200.0 |
|
| 4.8 v (Residue on sieve % by mass) |
1200.0 |
|
| 4.8iii (Colour) |
1200.0 |
|
| 4.8 ii (Finish) |
1200.0 |
|
| 4.8 i (Drying time Hard dry) |
1200.0 |
|
| 4.7 (Keeping properties) |
5000.0 |
|
| Cl 4.4 (Lead Restriction) |
1200.0 |
|
| Cl 4.1 (Composition) |
3500.0 |
|
|
| 2835 |
National Test House (NR), Ghaziabad
| Berger Customer Specification -NTH ER Paint 1 (2022) - Berger Customer Specification -NTH ER Paint 1 |
Berger Customer Specification -NTH ER Paint 1 |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 1 (Shelf life @ 30 °C
For 12 Months both liquid and powder) |
10000.0 |
|
|
| 2836 |
National Test House (NR), Ghaziabad
| Custom specification Paint coating - Custom specification Paint coating Fire retardant test as per customer requirement |
Custom specification Paint coating Fire retardant test as per customer requirement |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| Custom specification for paint coating (Surface flame spreading/fire retardant test for 0 -1 hour) |
3000.0 |
|
| Custom specification for paint coating (surface flame spreading/fire retardant test for 1 - 2 hours) |
5000.0 |
|
|
| 2837 |
National Test House (NR), Ghaziabad
| IS 1964:2001 (2001) - Methods for Determination of Mass per Unit Lenght and Mass per Unit Area of Fabrics |
Methods for Determination of Mass per Unit Lenght and Mass per Unit Area of Fabrics |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| Method-A (Grammage of Fabric (GSM)) |
1000.0 |
|
|
| 2838 |
National Test House (ER), Kolkata
| IS 1730 (1989) - Dimensions for steel plates,sheets strips and flats for general engineering purposes |
Dimensions for steel plates,sheets strips and flats for general engineering purposes |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
No Record Found
|
|
| 2839 |
National Test House (ER), Kolkata
| ER-LP-Intensity-01 - Peak Intensity measurement at different Mode. |
Peak Intensity measurement at different Mode. |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| A1 (Peak Intensity measurement at Single Mode, on the lines of IS - 16106 : 2012) |
10000.0 |
|
| A2 (Peak Intensity measurement at Dual Mode , on the lines of IS - 16106 : 2012) |
20000.0 |
|
| A3 (Peak Intensity measurement at Triple Mode , on the lines of IS - 16106 : 2012) |
30000.0 |
|
|
| 2840 |
National Test House (NR), Ghaziabad
| IRS S 63 (2014) - PVC Insulated underground unsereened cable for railway signaling |
PVC Insulated underground unsereened cable for railway signaling |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 5.6 (Dimensions of Signaling Cable) |
500.0 |
|
| 5.7 (Conductor Resistance Signaling Cable) |
1000.0 |
|
| 5.8 (Tensile Strength of Armour) |
1000.0 |
|
| 5.1 (Thickness of inner sheath) |
500.0 |
|
| 5.1 (Thickness of Outer Sheath) |
500.0 |
|
| 5.8 (Dimension of Armour ( Signaling Cable)) |
500.0 |
|
| 5.8 (Percentage (%) elongation Armour tape(signaling Cable)) |
500.0 |
|
| 5.8 (Percentage (%) elongation Armour wire(signaling Cable)) |
500.0 |
|
| 5.8.6 (Resistivity on Armour ( Signaling Cable)) |
1000.0 |
|
| 5.1 (Tensile Strength of Insulation before ageing) |
500.0 |
|
| 5.1 (Tensile Strength of Insulation after ageing) |
1000.0 |
|
| 5.10.2 (Percentage (%)Shrinkage) |
1000.0 |
|
| 5.10.4 (Loss of Mass of Insulation and sheath) |
1000.0 |
|
| 5.10.4 (Loss of Mass of Insulation and sheath) |
1000.0 |
|
| 5.10.11 (Thermal stability of Insulation and Sheath) |
1000.0 |
|
| 5.11 (Period of burning after removal of flame) |
1000.0 |
|
| 5.11 (Decomposed length of sample) |
1000.0 |
|
| 5.12 (High Voltage in Air 4 kV AC) |
1000.0 |
|
| 5.13.3 (Insulation Resistance in Air ( Signaling Cable)) |
1000.0 |
|
| 5.14 (AC High Voltage Test 8 kV( Water Immersion)) |
1000.0 |
|
|
| 2841 |
National Test House (NR), Ghaziabad
| RDSO IRS S 63/2015 : Part 1 : Sec Revision 4 (2014) - PVC Insulated,underground, unscreened cable for Railway Signalling |
PVC Insulated,underground, unscreened cable for Railway Signalling |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
No Record Found
|
|
| 2842 |
National Test House (SR), Chennai
| CUS/SR/MECH-2 - Shear plate |
Shear plate |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 1.0 (Breaking load) |
3000.0 |
|
|
| 2843 |
National Test House (SR), Chennai
| IS 16532: 2017 (2017) - APP Modified Bituminous Waterproofing and Damp Proofing Membrane with Polyester Reinforcement |
APP Modified Bituminous Waterproofing and Damp Proofing Membrane with Polyester Reinforcement |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 6..0 (Thickness) |
1000.0 |
|
| 6.0 (Cold Flexibility) |
2000.0 |
|
|
| 2844 |
National Test House (ER), Kolkata
| CUSTOMER SPECIFICATION CHEMICAL PAINT NTH ER (2022) - CUSTOMER SPECIFICATION CHEMICAL PAINT NTH ER
ASIAN PAINTS |
CUSTOMER SPECIFICATION CHEMICAL PAINT NTH ER
ASIAN PAINTS |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 1 (Specific Gravity) |
1000.0 |
|
| 2 (Volume solids ,% by mass) |
1000.0 |
|
| 3 (Zinc content,% by mass) |
1500.0 |
|
| 4 (Drying time ,Touch Dry) |
500.0 |
|
| 5 (Drying time Full cure) |
500.0 |
|
| 6 (Adhesion Test (cross-cut)) |
700.0 |
|
| 7 (Adhesion Pull Off (ASTM D 4541)) |
4000.0 |
|
| 8 (Storage stability (pot life)) |
2000.0 |
|
|
| 2845 |
National Test House (ER), Kolkata
| IRC-83 (1987) - Elastomeric Bearings |
Elastomeric Bearings |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 915.1 (Identification of polymer) |
3000.0 |
|
| 915.1.3(i) (Ash Content) |
2000.0 |
|
| 915.13(ii) (Polychloroprene Conetnt) |
4000.0 |
|
| 915.2(1.1) (Hardness) |
1000.0 |
|
| 915.2(1.2) (Tensile Strength) |
2000.0 |
|
| 915.2(1.3) (Elongation at Break) |
1000.0 |
|
| 915.2(2) (Compression set) |
3000.0 |
|
| 915.2(3.1) (Change in Hardness) |
2000.0 |
|
| 915.2(3.2) (Change in Tensile Strength) |
3000.0 |
|
| 915.2(3.3) (Change in Elongation) |
1000.0 |
|
| 915.2.2 (Adhesion Strength of Elastomer to Laminate) |
3000.0 |
|
| 916.2.2(iii) (Thickness of individual elastomer layer) |
1000.0 |
|
| 916.2.2(iv) (Thickness of Outer Layer) |
1000.0 |
|
| 916.2.2(v) (Number of Internal Layers of Elastomer) |
500.0 |
|
| 916.2.2(vii) (Thickness of Steel Laminates) |
500.0 |
|
| 12.0 (Ultimate Compressive strength) |
6000.0 |
|
|
| 2846 |
National Test House (ER), Kolkata
| RDSO SPEC/E. NO. SPEC/E-7/17-REV1 (2004) - Resin Pre-Impregnated Semi-Cured Unidirectional Glass Banding Tape |
Resin Pre-Impregnated Semi-Cured Unidirectional Glass Banding Tape |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 5.1 (Identification of Resin) |
5000.0 |
|
|
| 2847 |
National Test House (ER), Kolkata
| Customer Specification NTH ER CONCRETE ADMIXTURES (IS 9103) (1991 RA 2018) - Customer Specification NTH ER CONCRETE ADMIXTURES
(IS 9103) |
Customer Specification NTH ER CONCRETE ADMIXTURES
(IS 9103) |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 9 (i) (Dry material content % by mass) |
1000.0 |
|
| 9 (ii) (Ash Content % by mass) |
1000.0 |
|
| 9(iii) (Relative density) |
1000.0 |
|
| 9 (iv) (Chloride ion content % by mass) |
1000.0 |
|
| 9 (v) (PH) |
1000.0 |
|
|
| 2848 |
National Test House (WR), Mumbai
| IS 9537 ( Part 3) (1983) - Specification for conduits for electrical installations ( Part 3) rigid plain conduits of insulating materials. |
Specification for conduits for electrical installations ( Part 3) rigid plain conduits of insulating materials. |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 14.1 (All tests constituted under type tests) |
12500.0 |
|
| 14.2 (All tests constituted under acceptance tests) |
8000.0 |
|
| 7.0 (Dimensions) |
1000.0 |
|
| 6.2 (Durability of Marking) |
1000.0 |
|
| 7.4 (Uniformity of Wall Thickness) |
1000.0 |
|
| 8.0 (Construction) |
1000.0 |
|
|
| 2849 |
National Test House (NR), Ghaziabad
| IS:3025 - Methods of sampling and test (Physical & chemical) for water and waste water |
Methods of sampling and test (Physical & chemical) for water and waste water |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| CL 8 (Part 44,58,11,16 &17 ) Essential Parameters (Please see Annexure) |
12000.0 |
|
| 6,Table1 ICP-OES Elements (Please see Annexure) |
7000.0 |
|
| Cl 8 Essential Parameters as per NMCG Requirement (Cl 8 -Essential Parameters as per NMCG Requirement (Please see Annexure)) |
10000.0 |
|
| APHA-23 edition Microbiological Parameters as per NMCG(Please see Annexure) (APHA-23 edition Microbiological Parameters as per NMCG(Please see Annexure)) |
2000.0 |
|
|
| 2850 |
National Test House (NR), Ghaziabad
| IS 13730(Part-9):1994,Reaffirmed 2005. (1994) - Specification for Particular Types of Winding Wires:Polyester Enamelled Round Aluminium Wire, Class 130 |
Specification for Particular Types of Winding Wires:Polyester Enamelled Round Aluminium Wire, Class 130 |
- View breakup
-
| Clause No. |
Testing Charges (Excl. Of Taxes) |
NABL |
| 4 (Dimensions) |
1000.0 |
|
| 5 (Electrical Resistance) |
2000.0 |
|
| 6 (Elongation) |
9000.0 |
|
| 9 (Heat Shock) |
500.0 |
|
| 4 (Dimensions) |
1000.0 |
|
| 13 (Break Down Voltage Test( At Room Temperature)) |
3000.0 |
|
| 8 (Mandrel winding test) |
1500.0 |
|
| 8 (Stretching test) |
1500.0 |
|
| Tests (i)Measurement of diameter of conductor, ii)Measurement of increase in diameter,iii)Measurement of overall diameter,iv)Mandrel Winding Test,v)Weight check.) |
4500.0 |
|
|